11 Aug, 2023

The site is around 1.4 miles from Monks Cross, approximately 10 miles north east of Preston and 5 miles north of Blackburn. Scope of Services includes all of the Pre-Construction Planning, Construction Environmental Management Plan, Pre-Construction Information, support in the assembly of the HBF Agreement, Liaison with NHBC, Audit and review of Construction Phase Process.

The Scope of the project included:

  • 233 dwellings which includes a mixture of dwelling types such as Detached, Semi-Detached and Terraced Properties.
  • The application scheme will provide 70 affordable dwellings, representing 30% of the total number of houses proposed on this development.
  • The overall development will provide a mixture of 1, 2, 3 & 4 Bed Houses to accommodate the rise in demand for family homes within the rea.
  • Due to varying ground conditions found on this development, there is to be a mixture of foundation types to be used which are strip foundations, trench fill foundations and driven pile foundations

Our Role:

  • Identifying, eliminating or controlling foreseeable risks
  • Ensure designers carry out their duties (Design Reviews).
  • 7 Year 400 Unit Scheme, Multiple Interfaces, Utilities, Off Site Works, Council Liaison
  • Commissioning the necessary Surveys (Geotechnical, Topographical GS6 etc)

Further case studies and referrals are avaiable on request.